Reported Fault
Teupen Leo Requires new control box and ground receiver replacing.
Works carried out by Engineer:
Ground receiver and control box both replaced and the new ones synchronised together. Once both were synchronised machine started working when driving the machine, we drove it 10-15 meters away from control box and it continued to work without fault. The operator then set the machine up on its stabilisers and started going up on the booms. It went all the way to full height without issue then the main tele went out with the main boom in the horizontal positions and machine then slewed round without issue.
Technical Specifications
Works carried out by Engineer:
Carry out thorough examination on this manitou 280TJ to find
jib level ram leaking hydraulic oil from the wiper seal. This will need to be repaired before the loler (Thorough examination) can be completed.

Reported Fault
Holland Lift would not steer left.
Works carried out by Engineer:
Engineer arrived on site and removed FPE-16 Extension module and replaced two relays on the PCB. Machine left functioning as it should.
Works carried out by Engineer:
Requested pre delivery inspection to this JLG 1850 machine checked for operators manual, structural damage, battery levels, gates, tyres. All hoses checked for any damage or leaks, all oils and coolants checked .key switches and emergency stops checked. checked all elevating and lowering to make sure machine is safe to go on site.
Works carried out by Engineer:
Carry out Service and thorough examination on Nifty Lift HR15.
Check all batteries and charger, Change filters, grease all areas required. oil change and carry out thorough examination with certificate issued to customer. Rebooked thorough examination for six months time.
Reported Fault
Report of issue with the battery
Works carried out by Engineer:
Arrived on site located machine, customer explained machine was not holding charge and only lasting 30 Minuets. On inspection found machine to be discharged on further investigation found that the AGM Batteries are not holding charge and require replacement. Returned to site to replace batteries, Machine functioning as it should.
Reported Fault
Machine will not drive or steer
Works carried out by Engineer:
Engineer Arrived on site to locate machine, machine was tilted half on the road and half on the pavement, contractor was trying to use the machine whilst tilted without the boom being stowed, explained the operation of the machine stowed the boom and machine drove and steer without issue, took jib up in the air to a safe height.
Emergency lowering from the basket
Dual fuel option
Combination Articulated boom with top telescope
140° Flick boom complete with basket rotation
Reported Fault
Jib not lowering
Works carried out by Engineer:
Engineer arrived on site, on speaking with the customer we found out that the machine would hub up but not down, the customers workmen had disconnected the hydraulic hose for the down jib function to enable the jib to lower, on further investigation when all hoses had been re-attached the machine would only jib up not down, removed the up and down jib hydraulic hoses and reversed them this seem to clear the fault on the jib, we then put the hydraulic hoses back to their correct places, I topped up the hydraulic oil, carry out function test from ground controls and basket controls machine operating as should be. Customer happy with result.
Works carried out by Engineer:
We carried out a thorough exmination (LOLER) on this SkyJack 3219. Loler certificate issued no faults found.
Works carried out by Engineer:
Our engineer carried out a 500 hour service on this Magni RTH and a thorough examination (LOLER)
Reported Fault
Engine shuts down when under full load.
Works carried out by Engineer:
Plug Deutz Serdia tool in to check engine failures to find coolant level low and ECU requesting engine shut down. History of machine checked, We attended this machine on site in London and advised the water pump requires replacement. Water topped up and faults cleared.
LGMG SR1018D(SR3369D)
Reported Fault
GCU Fault
Works carried out by Engineer:
Engineer arrived on site to locate machine, the machine would not start. New GCU to fit and calibrate, on further investigation engineer found that the main Earth lead to the engine bell housing had snapped and tucked itself under the scissor pack, engineer carried out a repair putting a new earth lug on the earth cable and attached it to the engine bell housing, carried out a function test and engine started and machine operated, It was suggested the machine be taken out of service until it is recovered.
Reported Fault
Error codes reported
Works carried out by Engineer:
No fault found machine fully function tested, reported as operator error.
HL275D
Reported Fault
Machine will not lift
Works carried out by Engineer:
Machine had end of line grease switch fault. We pulsed 24v to x307 on the extension module to flash the switch so that we could get the grease pump to kick in. Once the grease pot started it run for about 10min reaching a pressure of 100bar. The grease cycle finished machine was function tested by myself and the customer and fault did not reappear.
Requested Pre Delivery Inspection
Works carried out by Engineer:
Carried out Pre Delivery Inspection (PDI)
LGMG T20J-H
Thorough examination (LOLER)
Works carried out by Engineer: Carried out thorough examination.
Reported issue:
Machine had no functions
Works carried out by Engineer:
Fault traced to K2A relay, Relay replaced machine left working as it should.
HOLLAND LIFT HL330 E14
Thorough examination (LOLER) carried out on this HL330 E14
Requested Machine Service by customer
Works carried out by Engineer:
Carried out Full service.
NIFTY LIFT HR28
ROPE REPLACMENT REQUIRED
Works carried out by Engineer:
Removed the boom section and ropes, Replaced with new ropes.
Replaced boom section and warepads.
Requested king pins and bush replacment
Works carried out by Engineer:
Removed all king pins and bushes,
Replaced with new king pins and bushes, Removed and replaced steer pins.